Transport of brine - technological pipelines,
Kosakowo,
Poland

Transport of brine - technological pipelines

Transport of brine - technological pipelines

The technological pipelines transporting the brine washed out during the construction of underground gas storage facility followed by its discharge into the Puck Bay.


The extension of underground gas storage facilities is very important from the perspective of Poland’s gas security and thus for a number of years has been one of investment priorities of PGNiG. KPMG Kosakowo is the first underground methane-rich content gas storage facility in northern Poland constructed in rock salt bed. The gas will be stored in adapted salt chambers at the depth of 1000 to 1200 m. The completion of the entire investment is planned for 2020 and as of 2014 it will be operating with capacity of 100 million m3.

Location
Kosakowo, Poland
Completion
2009
Building Type
Industrial
Product systems
Industrial pipes
Project Type
New building

The construction of target ten storage chambers of total capacity of 250 million m3 will involve excavation of 3.4 million tones of salt in the form of a brine of approx. 18 million m3 volume. The storage chambers are created by salt leaching with the use of water pumped into the salt bed. This process results in the formation of a brine, which should be managed or discharged in a safe manner into the reservoir.

As of 2010 this brine is discharged through pipeline WehoPipe PE DN 355 into the Puck Bay. A system of diffusers was installed in the distance of 2.3 km from the shore at 8m depth, which allows to control the distribution of the brine in the Puck Bay waters. The current failure-free operation of the brine pipeline confirms the suitability of PE system to such demanding and high-level applications.

Transport of brine - technological pipelines

Kosakowo referece Uponor Infra
Kosakowo referece Uponor Infra
Kosakowo referece Uponor Infra
Kosakowo referece Uponor Infra
Similar projects

The Port of Aalborg is based on sustainable sewer pipes

A special partnering agreement has enabled new and more sustainable stormwater pipes for the port expansion in Aalborg. 
 

Jäähdytysvesiputki hallitusti merenpohjaan

Hangon edustalla laskettiin huhtikuussa mereen Weholite Marine -putki – kooltaan ID/OD 1 000/1 125 mm – tuomaan jäähdytysvettä 22 metrin syvyydestä.

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.

A durable and reliable solution for wastewater

The Weholite tanks, with an inner diameter of three metres, delivered to the Riihimäki wastewater treatment in Southern Finland will ensure that the plant keeps running, even during emergencies.