Drainage system for heat and power station,
Gdynia,
Poland

Drainage system for heat and power station

Drainage system for heat and power station

Slotted drainage VipLiner module made by Uponor Infra has been chosen to build a drainage system for heat and power station of Gdynia.


The heat and power plant in Gdynia struggled with choking drainage ducts and the resultant elevated level of ground water, which would lead to flooding of the underground levels of the facility. The construction of a classic drainage system using excavation methods was seriously challenged and even impossible in many places due to collisions with numerous underground systems as well as the protective zones of overhead power lines. As a result, a decision was taken to build a new drainage network in the trenchless technology with the use of jacking drainage VipLiner DN630mm modules from Uponor Infra.

Location
Gdynia, Poland
Completion
2016
Building Type
Industrial
Product systems
Drainage, Tailor made constructions, Industrial pipes
Project Type
New building

VipLiner drainage modules feature solid polyethylene (PE) pipes with smooth inner and outer surfaces. Due to their strength characteristics, special technology and geometry of their outer layer grooving, the modules can be used for trenchless drainage systems which lower the level of ground waters. VipLiner 1-metre drain module have slots made using a water jet cutter. 240 slots of 150mm x 1.5mm in size are spaced in perpendicular along the axis. Their cross-section has a wedge shape, with the narrower opening at the inner surface. Such cross-sectional geometry creates a natural reverse filter, ensuring that the soil surrounding the drain pipe is not washed away.

This world-first method is innovative and patented!

Slotted drainage VipLiner module has been awarded the TYTAN 2016 Award in the ‘Product of the Year’ category during the XIV International Conference "Trenchless Engineering" in Krakow.

Drainage system for heat and power station

Elektrocieplownia Gdynia 2016 VipLiner 1
Elektrocieplownia Gdynia 2016 VipLiner 2
Elektrocieplownia Gdynia 2016 VipLiner 3
Elektrocieplownia Gdynia 2016 VipLiner 4
Similar projects

The Port of Aalborg is based on sustainable sewer pipes

A special partnering agreement has enabled new and more sustainable stormwater pipes for the port expansion in Aalborg. 
 

Jäähdytysvesiputki hallitusti merenpohjaan

Hangon edustalla laskettiin huhtikuussa mereen Weholite Marine -putki – kooltaan ID/OD 1 000/1 125 mm – tuomaan jäähdytysvettä 22 metrin syvyydestä.

Record-breaking pipes in Keljonlahti

Construction of the pipe network for cooling water at the Keljonlahti power plant began in December 2008. 3,000/3,300 mm Weholite pipes were selected for the network. The combined length of the entire intake and discharge pipe network for cooling water is 1,714 metres.

A durable and reliable solution for wastewater

The Weholite tanks, with an inner diameter of three metres, delivered to the Riihimäki wastewater treatment in Southern Finland will ensure that the plant keeps running, even during emergencies.