References

Meander,
Amersfoort,
Netherlands

Meander

Meander

Large, modern and fitted with the latest in air conditioning technologies. In 2012, construction work got underway on a new world class hospital on Maatweg in the Dutch city of Amersfoort. The building has since been handed over, and patients can now be better accommodated than at the old sites in Amersfoort.

Location
Amersfoort, Netherlands
Completion
2013
Building Type
Municipal
Product systems
Radiant Heating & Cooling
Address
Meander Medical Centre
Project Type
New building

The Meander Medical Centre’s two old buildings were 50-60 years old. As the hospitals were highly antiquated, the decision was made to build a new one. The new-build site replaces the old sites and houses the latest technology. This will once again enable the hospital to go on far into the future. Using techniques including concrete core activation a pleasant, comfortable and healthy living environment is being created for both patients and staff. Patient welfare, after all, is not dependent on doctors alone, but also on the environment.

Similar projects

Pump structure secures stormwater system’s long life

Pump structure secures stormwater system's long life in Jyllinge Nordmark

The power supply to the East Helsinki metro network will be protected with Uponor FastGuard

In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.

The power supply to the East Helsinki metro network will be protected with Uponor FastGuard

In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.