EMT: Bus depot, Madrid,
Madrid,
Spain
EMT: Bus depot, Madrid
The Empresa Municipal de Transportes de Madrid, SA (EMT) installs Uponor´s Invisible Air- Conditioning system in the newly renovated bus parking facility.
developer
EMT Madrid
Spain
installer
Acciona Instalaciones
EMT is considered the largest urban transport company in Spain and one of the biggest in Europe.
EMT is making every effort to improve the quality of the service it provides through its network of bus routes. Its prime concern has been, and remains, to satisfy customers´ needs and shoulder its duty of proceeding with its activities while paying particular attention to all aspects of environmental protection and energy efficiency.
As a result of its strategic growth plans, the decision was taken to scale up its bus service by a further 10% to a total of 2.272 vehicles. Therefore ir became also necessary to build a new operational centre in Madrid, which is to include the refitting and construction of bus depot.
The hope was that with the renovation, the new building could rise to a new level with its energy efficiency, and increase comfort for the EMT employees in the process. Thus the project group quickly realised that to opt all this, they needed to incorporate more advanced solutions in the building in term of air-conditioning and energy, still making, sure that the technical and finalcial between the initial cost and functional performance in the next few years would be as good as possible. Having examined several air-conditioning systems, EMT´s consulting partner decided to install Uponor´s Invisible underfloor cooling and heating solution.
Similar projects
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor Vortex stormwater solution
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.