ProFuse installed in Borås Stad,
Frufällan,
Sweden

ProFuse installed in Borås Stad

Better water flow in Frufällan

When the 250 millimeter pipes ProFuse replaces old 150 millimeter pipes in cast iron on a two-kilometer stretch in Frufällan, society will have a significant increase in capacity for the vital water supply. In addition, the new pipes provide fewer coatings and thus less service needs and better hygiene.
 
Switch to ProFuse
The increase in capacity is made possible by the change from the old 150 millimeter pipes to Uponor's ProFuse pressure pipe system with a diameter of 250 millimeters. In addition to about 500 meters where excavation is required, the new pipes are laid with pipe bursting. You take step by step, pass through threaded rods through the old pipes and attach the new pipe to the other end. Then the new pipe is pulled back and ends up right away without the need for devastating excavation. Pipe bursting is used on the remaining 1.8 kilometers.
 
"So in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe."
 
Pipe bursting is a flexible method when new pipes are to replace existing ones. There will be minor disturbances and ground damage. The risks lie in any intersecting lines and if the pipe does not go deep enough. Cracks or damage can then occur. To minimize the risks, the contractors have good control of all existing pipelines and film both before and after the work.
 
ProFuse replaces old-fashioned cast iron pipes
Pressure pipes ProFuse replaces old-fashioned cast iron pipes. So, in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe. Cast iron pipes tend to attract a lot of coatings that risk stopping the flow completely. Such coatings do not occur in a plastic pipe. The new pipes on Skogsrydsvägen can be seen as a first stage.

Location
Frufällan, Sweden
Valmistuminen
2010
Rakennustyyppi
Verkostorakentaminen

Certainly, more routes will have new pipes with higher capacity in the future," says Magnus Eriksson, foreman at the Service Office, City of Borås.

Samankaltaisia projekteja

Pump structure secures stormwater system’s long life

Pump structure secures stormwater system's long life in Jyllinge Nordmark

Levin matkailumekkaan Uponor Flowise -alavesisäiliöt

Levin laskettelurinteet houkuttelevat vuosittain tuhansia matkailijoita. Vedenkulutus vaihtelee suuresti, minkä vuoksi Levin Kirakan vedenottamo saneerattiin vastaamaan huippusesonkien kulutuspiikkeihin. Uponor toimitti osana projektia kaksi valtavaa alavesisäiliötä, jotka turvaavat puhtaan veden riittävän saannin alueella.

Kaukolämpöä auringon lämmittämästä merivedestä

Energiayhtiö Helenin Helsingin Kruunuvuorenrantaan rakennuttama lämpöenergian kausivarasto on ainutlaatuinen hanke niin Suomessa kuin maailmallakin. Merivettä varastoidaan kesällä kallioluolaan, ja sen lämpö siirretään talvella kaukolämpöverkkoon. Uponor Infra Marine Services vastasi vedenalaisen purkuputken toimituksesta ja vaativasta asennuksesta.
 

Itä-Helsingin metroverkon sähkönsyöttö suojataan Uponor FastGuardilla

Helsingin Siilitien ja Kulosaaren välisellä metroradalla toteutettiin uraauurtava sähköremontti syksyllä 2024. Tavoitteena oli parantaa metroradan sähkönsyöttöä ja varmistaa sen toimivuus myös vikojen aikana osana laajempaa rengasverkkoratkaisua. Hankkeessa käytettiin Uponorin kehittämää FastGuard-kaapelinsuojausta, joka on kevyt, kestävä ja nopea asentaa.