Opening in 2012, the Environmental Arena offers business and organisations from the environmental sector the largest and most spectacular platform for promoting environmental issues and energy efficiency.

Location
Spreitenbach, Switzerland
Ferdigstilt
2012
Bygningstype
Kommunalt område
Product systems
Gulvvarme-system
Adresse
Umwelt Arena AG
Prosjektype
Ny bygning

Here visitors will find all the information and products they need for an "environmentally responsible lifestyle" under one roof. The Environmental Arena itself makes a further significant contribution to the topic of sustainability: Despite measuring over 11,000 m², the building will operate with a neutral carbon footprint. The spectacular architecture also provides the basis for Switzerland's largest integrated photovoltaic heating system.

With the expected potential to attract approx. 300,000 visitors each year, the Environmental Arena is the brainchild of W.SCHMID AG in Glattbrugg ZH, which is responsible for the management of the project. The architectural design was entrusted to René Schmid Architects, Zurich. The Environmental Arena is being built by W.SCHMID AG.

Innovative building automation systems
The building automation systems used are as innovative and sustainable as the Environmental Arena itself. Instead of using a conventional cooling unit, the Environmental Arena uses the heat of the sun to stay cool in summer and warm in winter.
The Environmental Arena is heated and cooled using a system of pipes installed in the concrete ceilings that measures around 60 kilometres in length (TABS system). Water circulates in the roughly nine kilometres of ground register pipes laid under the foundations of the lower parking level In summer this uses a heat exchange to supply cold water to the network of pipes, while using the heat in the soil to supply hot water to the system in winter. In addition, the excess heat is again stored in the underground storage facility in the summer, enabling it to be used to provide heat next winter.

When it came to choosing the right partner for the ground registers, Uponor and its high-quality pipes won out. At total of 9,615 metres of size 25 PE-Xa pipe contribute to a pleasant and evenly balanced climate. However, Uponor not only supplied the pipes, but also provided support in the laying and simulation stages.

Umwelt Arena

umwelt arena_spreitenbach_2
umwelt arena_spreitenbach_3
umwelt arena_spreitenbach_4
umwelt arena_spreitenbach_5
umwelt arena_spreitenbach_1
umwelt arena_spreitenbach_6
Lignende prosjekt

Pump structure secures stormwater system’s long life

Pump structure secures stormwater system's long life in Jyllinge Nordmark

Vortex rensebrønd optimerer renseeffekten

For at sikre vandkvaliteten i naturen intensiverer Brønderslev Forsyning nu indsatsen for sikker rensning af regnvand. Uponor Infra leverer specialdesignede rensebrønde, som skal rense regnvand fra et 20 hektar stort oplandsareal, før det udledes i et regnvandsbassin.

Strømforsyningen til Helsingfors t-banenettverk skal beskyttes av Uponor FastGuard

Høsten 2024 ble det utført en banebrytende elektrisk renovering på metrolinjen mellom Siilitie og Kulosaari i Helsingfors. Målet var å forbedre t-banelinjens strømforsyning og sikre dens funksjon ved eventuelle feil, som en del av en bredere løsning. Prosjektet brukte Uponor FastGuard kabelbeskyttelse – en løsning som er holdbar, lett og rask å installere.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.