Referanser

Infra Utility Tunnel installation,
Lund,
Sweden

Infra Utility Tunnel installation

More efficient building rights with an infra utility tunnel

Akademiska Hus is together with the campus facility Cassiopeia plans to build about 300 apartments in Lund

Location
Lund, Sweden
Ferdigstilt
2023
Bygningstype
Kommunalt område
Product systems
Spesial løsninger

Akademiska Hus gain constructions rights more effectively with Uponor Infra utility tunnel

Akademiska Hus planned to build approximately 300 apartments in Lund with the Cassiopeia campus facility. As the infrastructure did not fit in the existing street, it was solved with an Uponor Infra Utility Tunnel.
 
An infra utility tunnel of just over 90 meters and with a diameter of 2200 mm is in place and connected. Uponor Infra not only supplied the prefabricated culvert with all media pipes in place, but also assisted with dimensioning, construction drawings and welding.

For Akademiska Hus, the Uponor Infra utility tunnel solution means that they can use their building rights to a greater extent. The tunnel also provides access over time to be able to inspect and carry out maintenance work, says Jimmy Olsson, sales reps. Uponor Infra Project Services.

Lignende prosjekt

Pump structure secures stormwater system’s long life

Pump structure secures stormwater system's long life in Jyllinge Nordmark

Vortex rensebrønd optimerer renseeffekten

For at sikre vandkvaliteten i naturen intensiverer Brønderslev Forsyning nu indsatsen for sikker rensning af regnvand. Uponor Infra leverer specialdesignede rensebrønde, som skal rense regnvand fra et 20 hektar stort oplandsareal, før det udledes i et regnvandsbassin.

Strømforsyningen til Helsingfors t-banenettverk skal beskyttes av Uponor FastGuard

Høsten 2024 ble det utført en banebrytende elektrisk renovering på metrolinjen mellom Siilitie og Kulosaari i Helsingfors. Målet var å forbedre t-banelinjens strømforsyning og sikre dens funksjon ved eventuelle feil, som en del av en bredere løsning. Prosjektet brukte Uponor FastGuard kabelbeskyttelse – en løsning som er holdbar, lett og rask å installere.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.