Ultra Double replace concrete pipe line in Raahe,
Raahe,
Finland
Ultra Double replace concrete pipe line in Raahe
The old concrete pipe line in Raahe came to its end. The replacing pipe line was made of Uponor's newest sewer system, Ultra Double.
contractor
Maanrakennus E. Majava Oy
installer
Raahen Vesi Oy
installation of Uponor Ultra Double with it’s biggest diameter 680 mm
Uponor Ultra Double is a sewer system which is easy and fast to install. The size variety is wide from 200 mm up to 680 mm including also the fittings. The Ultra Rib 2 fitting system is suitable also for Ultra Double system as well many other Uponor’s pipe system. Ultra Double pipe has a solid socket and together with the durable sealing ring, the joint is always tight. In addition, the solid socket reduces 50% the amount of joints in pipeline. Therefore the maintenance cost later on are low. Uponor Ultra Double system has the Nordic Polymark approval.
New pipe line to replace the old concrete pipe line
The first installation for Uponor Ultra Double was made with it’s biggest diameter 680 mm. The target was at the centre of Raahe city where old leaking sewer pipe line was replaced by Ultra Double. According to the CEO of Raahe Vesi, Mr. Esa Seppänen, the old concrete pipes were still on quite good condition but the joints were leaking in and the amount of sewer water was increased. Naturally, the costs of purification of sewer water were high.
The new sewer is the same diameter than the old pipe line, 680 mm. But the flow circumstances are clearly better so the overall capacity will be enough. Despite that in couple of years there will be even 6 new multistory buildings in the centre which will be connected to the sewer pipe line, says Esa Seppänen. The most important factor in decision making was the joint technique that Uponor Ultra Double has. The tight joints are key issues in Raahe due to that the pipe line is installed lower than sea level. The danger of ground water leaking inside the pipe line is high as the old concrete joints proved. With Uponor Ultra Double there are significantly less joints in pipe line and together with durable sealing ring the leaking problem is now over.
The new pipe line is about 260 m long. While the old concrete pipes were excavated the new pipes were installed which made the whole process easy and fast. The excavation work was made by Maanrakennus E. Majava Oy and the pipes were installed by Raahen Vesi Oy’s own installers.
Lignende prosjekt
Vortex rensebrønd optimerer renseeffekten
Strømforsyningen til Helsingfors t-banenettverk skal beskyttes av Uponor FastGuard
Høsten 2024 ble det utført en banebrytende elektrisk renovering på metrolinjen mellom Siilitie og Kulosaari i Helsingfors. Målet var å forbedre t-banelinjens strømforsyning og sikre dens funksjon ved eventuelle feil, som en del av en bredere løsning. Prosjektet brukte Uponor FastGuard kabelbeskyttelse – en løsning som er holdbar, lett og rask å installere.
Uponor Flowise drinking water solution to Levi's tourism mecca
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Overvannsbehandling med Uponor Vortex gir enkelt vedlikehold
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.