The IKEA homestore in Rothenburg in the Canton of Lucerne, uses the TABS Thermally Active Building System from Uponor to cater for heating and cooling requirements.
Bauherr:
IKEA Supply AG, Grüssenweg 15, 4133 Pratteln, Switzerland
Installateur:
Cofely AG, Schweighofstrasse 14, 6010 Kriens, Switzerland
Planer:
Haustec Engineering AG, Güterstraße 5, 3072 Ostermundingen, Switzerland
Covering around 18,000 m2 of sales space, the IKEA homestore in Rothenburg in the Canton of Lucerne provides a pleasant atmosphere for its customers. In order to provide a cosy level of heat on cold days and a pleasantly cool climate in hot weather, the concrete ceilings of the building were fitted with the TABS Thermally Active Building System from Uponor, covering an area of 20,795 m2. Haustec Engineering AG in Ostermundingen planned the energy concept for the first IKEA homestore in central Switzerland.
Uponor installed 96,600 m of Uponor PE-Xa 20 x 2.3 mm pipe on behalf of trade specialists Cofely AG, Kriens. The pipes were installed locally on the concrete reinforcement, spaced at 15 cm apart. In addition, the specialist tradesmen fastened the PE-Xa pipes in place using Uponor fixing tracks. This meant that the pipes could be laid quickly and the follow-up work could be carried out quickly. The concrete structure was then cast. Compared to conventional air conditioning systems, Uponor TABS saves up to 50 percent of investment and operating costs. There is also no need for troublesome radiators. In addition, the components are practically maintenance-free.
The IKEA homestore in Rothenburg is heated and cooled in an energy-efficient way using Uponor TABS - also avoiding draughts. Hot or cold water flows through the pipes, heating or cooling the concrete ceiling. To provide cooling, the ceilings absorb the heat generated during the course of the day. During the night, the circulating water dissipates this heat, cooling the rooms and avoiding unwanted temperature variations caused by internal and external loads. The heat or cold stored in the ceilings between the floors is largely dissipated through radiation, as well as being partially returned to the space through convection.
The advantage is that, owing to the large activated areas, building activation allows heat to be supplied or dissipated efficiently even at low flow temperatures. The TABS system at IKEA in Rothenburg provides heat at a flow temperature of 30 °C and a return of 26 °C and cools at a flow temperature of 19 °C and a return of 23 °C. TABS thus achieves a heat output of about 35 W/m2 and cooling of about 40 W/m2.
Lignende prosjekt
Vortex rensebrønd optimerer renseeffekten
Strømforsyningen til Helsingfors t-banenettverk skal beskyttes av Uponor FastGuard
Høsten 2024 ble det utført en banebrytende elektrisk renovering på metrolinjen mellom Siilitie og Kulosaari i Helsingfors. Målet var å forbedre t-banelinjens strømforsyning og sikre dens funksjon ved eventuelle feil, som en del av en bredere løsning. Prosjektet brukte Uponor FastGuard kabelbeskyttelse – en løsning som er holdbar, lett og rask å installere.
Uponor Flowise drinking water solution to Levi's tourism mecca
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Overvannsbehandling med Uponor Vortex gir enkelt vedlikehold
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.