Contact
Uponor UK
Head Office
Uponor UK
The Pavillion
Blackmoor Lane
Watford Hertfordshiree
WD18 8GA
References

1. FC Brno, Football stadium,
Brno,
Czech Republic

Heating of Football Stadium

Optimal conditions all year round - without ice and snow.

Location
Brno, Czech Republic
Completion
2008
Building Type
Sports facilities
Product systems
Radiant Heating & Cooling
Project Type
Renovation

How to extend the playing season?

Heating grass playing surfaces Uponor keeps playing surface throughout the year in optimum conditions, ie. free of ice and snow. Excellent and stable conditions are dream of every professional athlete.

The heating pipe loops are implemented Meltaway Uponor PE-X 25 x 2.3 mm. Total installed about 38 km of pipelines. Uponor pipe manifolds are made ​​from HDPE (as needed supplied in 50 x 4.6 mm - 200 x 11.4 mm). Pipe connection to manifolds is realized by special plastic fasteners Rosex. Parts of manifolds are connected pipe butt welding. All system components are plumbing Meltaway of plastic materials, ie. Unlike competing ways of dealing with it is absolutely excluded the possibility of corrosion. Serves as a source of heat exchange station. The system is filled with antifreeze.

1. FC Brno, Football stadium

0002763
Similar projects