Elementary school in Poznan,
Poznań,
Poland
Elementary school in Poznan
This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011.
This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011 by contractor PTB Nickel. Up to 800 students can attend these schools. The project was made up of two parts, the educational and sports. In this block of buildings there were applied innovative architectural and technological solutions, which will be followed in the list of objects of the XXI century. Primary and secondary school in Poznan contains 41 classrooms, specialist rooms including: chemical, art classes, music, computer and audio-visual room. Part of the investment is sports: sports hall with seats for 400 spectators, gym, corrective gymnastics hall, playing fields for football, basketball and volleyball, sports track with a length of 60 m, the hill in the distance and a playground for the youngest.
For the tap water and central heating system in the school buildings there were used Uponor multilayer pipes with diameters from 16 to 63 mm. Moreover Ecoflex system with Uponor Thermo and Aqua pipes were lied, because of their flexibility and the low weight, as well as possibility of problem-free laying around corners and obstacles.
Poznanski educational complex in numbers:
- 4,356.33 m2 - built-up area
- 8,668.89 m2 - school floor area
- 41 class rooms with a total area 2,303.30 m2
- 440 m2 - inclusive playground-370 m2
- Multi-purpose field with tartan surface-2280 m2
- Grass field with synthetic-470 m2 - with tartan surface track - 1.3 ha
- The surface area-1306 m2 - sports hall with stands for 400 seats-246 m2
- Multimedia hall with 300 seats
Liknande projekt
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Elförsörjningen till östra Helsingfors tunnelbanenätverk kommer att skyddas av Uponor FastGuard
Hösten 2024 genomfördes en stor elrenovering på tunnelbanelinjen mellan Siilitie och Kulosaari i Helsingfors, Finland. Syftet var att förbättra tunnelbanelinjens strömförsörjning och säkerställa dess funktion vid eventuella fel som en del av en bredare lösning. I projektet installerade FastGuard kabelskydd utvecklat av Uponor, som är lätt, hållbart och snabbt att installera.
Uponor Flowise drinking water solution to Levi's tourism mecca
Ett gammal vattenverk i Finland uppgraderat till en modernare version
Korrosionsskador på vattenledningsnätet förhindrades tidigare med lut, men på grund av säkerhetsrisker ersattes det med en kemikaliefri metod. Samtidigt genomfördes en omfattande totalrenovering vid vattenverket.
Uponor Flowise lösningar för Levi i Finlands turistmecka
Som en del av projektet levererade Uponor två mycket stora reservoartankar för att säkerställa tillräcklig tillgång på rent vatten i området.
Tailored renovation solution
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Espoo's Itäranta is being renovated sustainably
Uponor filterbrunn ingår i en dagvattenstudie
Uponor filterbrunn ingår i en dagvattenstudie
Weholite installerat i London
Uponors tekonologi Weholite var lösningen till ett unikt projekt i London, där Lee- och Thames Tideway-tunneln har till uppgift att fånga upp i genomsnitt 39 miljoner ton avloppsvatten per år från de 35 mest nedsmutsade kombinerade avloppssystemen. Ett uppgraderat rörsystem designades för att minska antalet översvämningar – och deras påverkan på miljön – från Londons avlopps- och reningssystem. Syftet med det uppgraderade rörsystemet var att begränsa nedsmutsningen från avlopps- och reningssystemen som är anslutna till avloppsreningsverken i Beckton och Crossness.
Uponor Vortex stormwater solution
Reservoir tank for unordinary village of Tuuri
Säker vattenförsörjning för ett gammalt varvs- och sågverksområde
ProFuse installerat i Borås Stad
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.