ProFuse installed in Borås Stad,
Frufällan,
Sweden

ProFuse installed in Borås Stad

Better water flow in Frufällan

When the 250 millimeter pipes ProFuse replaces old 150 millimeter pipes in cast iron on a two-kilometer stretch in Frufällan, society will have a significant increase in capacity for the vital water supply. In addition, the new pipes provide fewer coatings and thus less service needs and better hygiene.
 
Switch to ProFuse
The increase in capacity is made possible by the change from the old 150 millimeter pipes to Uponor's ProFuse pressure pipe system with a diameter of 250 millimeters. In addition to about 500 meters where excavation is required, the new pipes are laid with pipe bursting. You take step by step, pass through threaded rods through the old pipes and attach the new pipe to the other end. Then the new pipe is pulled back and ends up right away without the need for devastating excavation. Pipe bursting is used on the remaining 1.8 kilometers.
 
"So in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe."
 
Pipe bursting is a flexible method when new pipes are to replace existing ones. There will be minor disturbances and ground damage. The risks lie in any intersecting lines and if the pipe does not go deep enough. Cracks or damage can then occur. To minimize the risks, the contractors have good control of all existing pipelines and film both before and after the work.
 
ProFuse replaces old-fashioned cast iron pipes
Pressure pipes ProFuse replaces old-fashioned cast iron pipes. So, in addition to the capacity increase with an increased diameter, you now also get a more hygienic pipe. Cast iron pipes tend to attract a lot of coatings that risk stopping the flow completely. Such coatings do not occur in a plastic pipe. The new pipes on Skogsrydsvägen can be seen as a first stage.

Location
Frufällan, Sweden
Færdiggørelse
2010
Bygningstype
Kommunalt byggeri

Certainly, more routes will have new pipes with higher capacity in the future," says Magnus Eriksson, foreman at the Service Office, City of Borås.

Lignende projekter

PE-pumpebygværk sikrer stormflodssystem lang levetid

WehoPanel pumpebygværk sikrer stormflodssystem lang levetid i Jyllinge Nordmark

The power supply to the East Helsinki metro network will be protected with Uponor FastGuard

In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.

Bæredygtig vandforsyning med ProFuse RC Blue

Ikast Vandforsyning har taget et nyt skridt i retning af bæredygtighed ved at installere ProFuse RC Blue-drikkevandsrør fra Uponor Infra. Det er en visionær tilgang til bæredygtighed, der afspejler Ikast Vandforsynings engagement i at tilbyde de bedste og mest bæredygtige løsninger til gavn for både borgere og miljøet.