Elementary school in Poznan

Elementary school in Poznan

This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011.

Location
Poznań, Poland
Færdiggørelse
2011
Bygningstype
Kommunalt byggeri
Product systems
Præisolerede rørsystem, Brugsvand- og varmesystem MLC
Adresse
Hezjoda 15
Projekttype
Ny bygning


This is the first school built from scratch after 1989 in Poznan. The construction of this modern educational center started in 2009 and was completed in 2011 by contractor PTB Nickel. Up to 800 students can attend  these schools. The project was made up of two parts, the educational and sports. In this block of buildings there were applied innovative architectural and technological solutions, which will be followed in the list of objects of the XXI century. Primary and secondary school in Poznan contains 41 classrooms, specialist rooms including: chemical, art classes, music, computer and audio-visual room. Part of the investment is sports: sports hall with seats for 400 spectators, gym, corrective gymnastics hall, playing fields for football, basketball and volleyball, sports track with a length of 60 m, the hill in the distance and a playground for the youngest.


For the tap water and central heating system in the school buildings there were used Uponor multilayer pipes with diameters from 16 to 63 mm. Moreover Ecoflex system with Uponor Thermo and Aqua pipes were lied, because of their flexibility and the low weight, as well as possibility of problem-free laying around corners and obstacles.


Poznanski educational complex in numbers:


- 4,356.33 m2 - built-up area


- 8,668.89 m2 - school floor area


- 41 class rooms with a total area 2,303.30 m2


- 440 m2 - inclusive playground-370 m2


- Multi-purpose field with tartan surface-2280 m2


- Grass field with synthetic-470 m2 - with tartan surface track - 1.3 ha


- The surface area-1306 m2 - sports hall with stands for 400 seats-246 m2


- Multimedia hall with 300 seats
 

Elementary school in Poznan

0002819
0002820
0002821
0002822
0002823
Lignende projekter

PE-pumpebygværk sikrer stormflodssystem lang levetid

WehoPanel pumpebygværk sikrer stormflodssystem lang levetid i Jyllinge Nordmark

The power supply to the East Helsinki metro network will be protected with Uponor FastGuard

In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.

Bæredygtig vandforsyning med ProFuse RC Blue

Ikast Vandforsyning har taget et nyt skridt i retning af bæredygtighed ved at installere ProFuse RC Blue-drikkevandsrør fra Uponor Infra. Det er en visionær tilgang til bæredygtighed, der afspejler Ikast Vandforsynings engagement i at tilbyde de bedste og mest bæredygtige løsninger til gavn for både borgere og miljøet.