Next stop: comfort,
Bad Salzungen,
Germany
Next stop: comfort
The municipal housing company GEWOG and the city of Bad Salzungen are redesigning the entire train station area in the spa town. The site includes a historic train station building. After the renovation, a social center will move into the first floor, and 13 apartments will be built on the upper floors and in the attic. To ensure that the future tenants are as comfortable as possible, the choice fell on decentralized apartment stations from KaMo and a combination of different systems for surface heating and cooling from Uponor.
- 13 Home stations
- 7 drinking water stations
- 650 sqm Uponor Klett | 800 sqm Uponor Contec ON | 200 sqm Uponor Renovis
Builder-owner:
GEWOG GmbH Bad Salzungen
https://www.gewog-basa.de/
Architect:
S&P Sahlmann Planungsgesellschaft für Bauwesen mbH Leipzig
https://sup-gruppe.com/
Construction:
Ingenieurbüro Kirchner (IBK Haustechnik) Bad Salzungen
https://ib-kirchner.de/
Reconstruction and redevelopment of the station area
Decentralised flat stations
The decentralised heat distribution in each flat is handled by a flat combination station with a 3-pipe module. The advantage is that the drinking water is heated promptly and according to demand. The temperatures - and thus also the operating costs - are lower than with central systems. Because there are less than three litres of water in the hot water pipes, there is no obligation to test for legionella. More distant taps in seven flats are each supplied by an Aqua Port Compact Base drinking water station.
Surface heating and cooling
Depending on the room height, use and type of construction, different systems are used for surface heating and cooling on the individual floors. For the social centre on the ground floor with its four-metre high rooms, the Uponor Klett underfloor heating system was ideal. For the upper floors with solid concrete ceilings, the specialist planners planned a near-surface component activation with the Uponor Contec ON system. The dry construction system Uponor Renovis is ideal for the wooden ceilings in the attic. Consultants from KaMo and Uponor were on hand to assist the planners, right through to special designs specifically for this building project.
"With the systems from Uponor and KaMo, we were able to optimise three factors at once: living comfort, drinking water hygiene and energy costs," specialist planner Harald Kirchner.
Podobne projekty
First high-rise residential building in Spain with Leed Gold certification
Avalon Prime
Greenwich Village on Coolhaven
Oval Village
Refurbishment of a prefabricated building
Decibel soil and waste system were installed in the new appartments in former prison Kakola.
Residential project with underfloor heating adapted for apartments
Infinity Forest Residence
The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.
Apartment building Varsta Oy
A housing company Petreliuksenrinne
Stylish rock home was renovated with practical viewpoint
Small group home gets its own Clean II -wastewater treatment plant
Applewood Pointe
Underfloor cooling adds value to new construction
The joint renovation project in Maunula – cost savings through co-operation
Durability and quality are crucial in the award-winning wooden apartment block
Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks
Ewha Campus Complex
Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.
Uponor participates in construction of Maarjamõisa Medical Campus
Sluseholmen
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments.
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area, which is located in Shanghai,songjiang district, with a total area of 42000 square meters, 540 apartments.