Adaptation to climate change with PE retention tanks
The Neptun Park estate is located approx. 100 m from the beach, in the immediate vicinity of the Ronald Reagan Seaside Park and numerous pedestrian and bicycle routes in the picturesque Gdańsk Jelitkowo, known for its recreational values. The estate is characterized by intimate low-rise buildings, referring to the pre-war buildings of Oliwa and Sopot, high standard of workmanship and a large amount of greenery. The last, fourth stage of the estate was built in 2015-2017, when 6 buildings were added, along with 184 apartments and commercial and service premises. Why was it necessary to expand the storm sewage system in a relatively new housing estate? In recent years, climate change has significantly influenced weather patterns, which is also observed in Poland. We are increasingly dealing with torrential rains, which, although shorter in duration, are much more intense. Two concrete retention tanks installed in the Neptun Park estate turned out to be simply insufficient during heavy rainfall.
- SN8 DN2400 retention tank composed of 2 parallel lines (L = 30 m each) and a perpendicular section L = 57 m
- Tank assembly and simplified tank tightness tests with air in the profile performed by the Uponor Infra service group.
Qualia Sp. z o.o.
Contractor:
Poleko Budownictwo Sp. z o.o.
Expansion of the storm sewage system right next to residential buildings
New PE retention tanks were placed in the free space between the blocks. One of the greatest advantages of Uponor Infra tanks is the ability to combine them into configurations of virtually any shape, which allows you to adapt them to the available space and project requirements.
This solution is particularly beneficial when installing in built-up areas, where it is necessary to take into account the existing underground infrastructure.
Conducting work right next to residential buildings was a big challenge. A key element was proper planning of the supply of tanks and the necessary equipment. Thanks to effective work organization, the task was completed with minimal impact on the residents' quality of life.
Similar projects
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Safe water supply for an old shipyard and sawmill area
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor Vortex stormwater solution
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.