The intensive care, emergency medicine and surgery centre of the Inselspital hospital in Bern, known as the INO, is efficiently heated and cooled using Uponor Contec Single.
Itten+Brechbühl AG, Nordring 4A, 3000 Bern, Schweiz
Bauherr:
Amt für Grundstücke und Gebäude Kanton Bern, Reiterstrasse 11, 3011 Bern
Planer:
Meierhans + Partner AG, Bahnstrasse 8, 8603 Schwerzenbach/ZH Quickborn, Schweiz
To ensure the comfort of staff and patients at the hospital, a total floor area of 12,352 m2 is thermally activated by means of Uponor's Contec Single thermally active building system. For this, prefabricated Uponor Contec Single registers were installed in the underlay flooring ex works. The MLC Dimension 16 x 2 mm multilayer pipes were supplied on site preinstalled with the backing mats. The pipes can carry either hot or cold water. When used for heating, the water warms the floor, which radiates the stored heat into the rooms. When cooling is required, the water radiates cold to the floor. This enables it to absorb and store the heat generated in the room. Uponor Contec Single heats and cools using mild radiant heat and cold. Because the system works evenly throughout the room, eddying is preventing, avoiding dust clouds. The hospital's entire heating network is supplied through the utilisation of waste heat from an incineration plant.
Despite the special medical use, the INO centre was built to comply with the Minergie standard and is run energy-efficiently. Thanks to the compact building design, the high level of thermal insulation and the controlled ventilation with thermal recovery systems, the INO has a low heating requirement. This meant that particularly low flow temperatures could be chosen with Uponor Contec Single, so that the surface temperature of the floor is almost the same as the required room temperature. The gentle, self-regulated heat reduces the energy required and saves the hospital significant operating costs.
In building terms, the INO is divided into a primary system (support structure, building envelope, logistics for media and traffic flow), secondary system (interior finishing and installations) and a tertiary system (technical medical equipment). In addition to the high level of energy efficiency, all the materials installed at the INO were required to meet hospital standards, i.e. long-lasting, robust and resistant to disinfectants.
The secondary system is required to last for a period of between 15 and 50 years. That's why the planners, Meierhans + Partner AG, chose Uponor's solution for the heating and cooling system. The multilayer Uponor pipe installed promises an impressively long service life. It is also impermeable to oxygen and corrosion-resistant and features low linear thermal expansion. The high degree of form stability and bending flexibility make the pipe particularly easy to install and very durable.
Similar projects
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Safe water supply for an old shipyard and sawmill area
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor Vortex stormwater solution
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
Water supply in very demanding terrain in Norway
A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.