Würth Logistics Centre is an exclusive build-to-suit project incorporating renewable energy sources.

 

 

Würth Logistics Centre: an exclusive build-to-suit project incorporating renewable energy sources

 

Location
Ukmergė district municipality, Vilnius county, Lithuania
Completare
2014
Tip de clădiri
Industrial buildings
Product systems
Încălzire & răcire radiantă, Local Heat Distribution
Adresa
Jačionys village, Pivonija Neighbourhood, Ukmergė District Municipality,
Tipul proiectului
Clădire nouă

The low-parameter, surface heating/cooling solutions deployed in this project are much more efficient than conventional heating systems. As a result, the desired temperature can be maintained in designated parts of the buildinginstead of overheating zones at the top, as is the case with convection heating. System integration with efficient geothermal sources ensures very low operating costs, and creates maximum comfort for people working in the building.

High demand and market potential for logistics buildings was recorded in Lithuania in the years 2011–2014. Therefore, a number of construction projects were implemented in that period, including build-to-rent logistics centres and build-to-suit buildings catering to highly specific client requirements.

The construction of the Würth Logistics Centre began in spring 2013 and combines two different zones: industrial warehousing and administration. The warehousing zone is an open 13-metre high space. The first floor of the centre’s administrative section contains a lobby, a shop, a café-canteen with a kitchen, a meeting room and technical premises. Administrative rooms and a meeting hall are located on the second floor.

The combination of different purposes in one building dictated the need for exclusive engineering solutions. Moreover, the client requested an energy-efficient solution.

The plot of land on which the logistics building is situated has 18 geothermal wells and Stiebel Eltron heating pumps with a total heating capacity of 138 kW. The pumps take heating from vertical geothermal probes.

The entire centre has Uponor radiant heating/cooling solutions installed. The administrative zone has a fitted PE-Xa d20 underfloor heating system with wired room controls (the parameterof the heat-transfer medium is 45 / 40 °C). The industrial and warehousing zone has an industrial underfloor heating system whose temperature is controlled via heat-transfer medium. The system maintains heating in the range of 25–35 °C.

The object has about 5,000 m2 of heated surface in total, with approx. 18 km of pipes and 23 Q&E modular collectors fitted under the floor. These collectors stand out from other similar products due toconnectors that are free of rubber sealants and sturdier than a pipe, and due to theheat-transfer medium which is fed via pre-insulated Uponor Thermo Twin pipe systems. 

In industrial buildings, large heating systems are usually mounted next to the ceiling. However, solutions such as these affect construction elements of the building and the reliability of connecting points. In order to avoid such issues, Uponor developed the Thermo Twin pipe systems. These systems are mounted in the ground: they are more reliable, fewer pipes are needed and they are faster to install and implement.

Due to selection of the right heating system, the logistics centre buildingcan also be cooled to 16-19 °C in summer.

The centre is built next to Vilnius-Panevėžys motorway. Its functional zones are clearly distinguished by bright colours on the outside of the building: the warehousing zone is grey and the administrative zone is red, with extensive use of tinted glass. This colouring mirrors that of the Würth logo.

 

Watch a video of the building process: https://www.youtube.com/watch?v=2PvsxIEmUmI

Würth Logistics Centre, Lithuania

wlc_1
wlc_2
wlc_3
IMG_1697
IMG_1703
wlc_6
wlc_main
Proiecte similare

Uponor Annex

The newest $18M manufacturing expansion for Uponor PEX pulls out all the stops with a highly efficient building incorporating the company’s plumbing, radiant, and snow melt systems. 

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.

 

Depozit eMag

Uponor a făcut încă un pas spre încălzirea radiantă sustenabilă, după ce a oferit o soluție de încălzire optimă pentru un depozit logistic care era, la momentul deschiderii, cel mai mare din Europa de Sud-Est.
Provocarea beneficiarului eMAG s-a transformat într-un proiect gândit pentru viitor, cu costuri optimizate pe termen lung.  
Cel mai mare retailer online din România a construit în comuna Joița, județul Giurgiu, două depozite logistice însumând 250.000 m².  Fiecare dintre ele a venit cu o arhitectură proprie, nevoi specifice și activitate constantă în spațiul din interior.

Valuable metals leach efficiently from the enormous heap in Talvivaara

Talvivaara is using a modern nickel leaching method that requires enormous quantities of durable pipes. The method requires high-quality, durable piping and professional pipe installation.