Uponor Pte. Ltd.
1 Fullerton Road
#02-01, One Fullerton
Singapore 049213
References

Production hall Eurom, Brno,
Brno,
Czech Republic

Production hall Eurom, Brno

Uponor industrial underfloor heating.

Place
Brno, Czech Republic
Completion
2010
Building Type
Industrial buildings
Product system
Radiant Heating & Cooling
Address
Slatina
Project Type
New building

An industrial underfloor heating system in fact

Headquarters of the company Eurom located in Brno Slatina includes administrative, storage and production facilities. It is a standalone building hall type, which is divided into two parts. The first part consists of administration and facilities. The second part consists of single-storey building with two-aisle production hall (the building footprint 78 x 36 m). Throw the center of each vessel leads communication area, around which individual manufacturing cells are concentrated. Both vessels are heated by an industrial underfloor heating system.
Underfloor heating: Uponor PE-Xa pipes 25 x 2.3 mm in clamp track
Floor Construction: Double Layer, steel fibre concrete.

Production hall Eurom, Brno

0002764
Similar projects