Uponor UK
Head Office
Uponor UK
The Pavillion
Blackmoor Lane
Watford Hertfordshiree
WD18 8GA

References

525 Results found
Multi storey building

Feeling comfortable and relaxed in loft apartments

The old factory building gets a new life as loft apartment building. Skanska Oy renovated the building into 23 different size and type of apartments.

Multi storey building

Durability and quality are crucial in the award-winning wooden apartment block

All solutions in the Puukuokka block, which was completed in Jyväskylä, have strived for sustainability, quality and coziness. Living comfort and energy efficiency are also ensured by radiant underfloor heating system installed in each of the block’s 186 homes.

Municipal

Don’t count on luck to protect you from flooding

With a bit of good luck, a property can overcome rains without flooding, but fewer and fewer count on such luck. As its stormwater solution, a waste power plant to be built in southern Finland chose one-hundred-metre long Weholite tanks.
 
Office

Day-care centre to be built with energy piles

As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.

Multi storey building

Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation

Housing company Hottonia located in Olari, Espoo, had a successful renovation that was finished in September 2018. Everything went according to time schedule and the result was excellent. The renovation was carried out with prefabricated solution Reno Port cassette.

Municipal

Clean drinking water for 17,000 scouts

Roihu 2016 – the 7th International Finnjamboree organised by Suomen Partiolaiset - Finlands Scouter ry, was held at the Evo campsite in Hämeenlinna on 20–28 July 2016. A camp for 17,100 people was built in a forest area owned by Metsähallitus. Some 3,000 participants arrived from abroad – from about 40 different countries. Uponor delivered 7,600 metres of pipes to the area. The pipes were used to supply clean water and to lead grey water away from the area in a controlled manner.

Sports facilities

Boost to energy efficiency

PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.

Multi storey building

Aleksanterinkatu 5 in Lahti will be completed with R2I blocks

An 8-storey apartment is rising in a former bank district in Lahti. The target will contain 265 apartments and is designed by A1 Arkkitehdit Oy and will be built by Nuorisosäätiö. There are 256 rental apartments reserved for students on floors 2-7. Uponor R2I blocks will be installed in all of the student-apartments in connection with bathroom and kitchen elements. Aleksi 5 is the first new destination in which R2I blocks are being delivered and in which sound-absorbing Decibel drains are used.

Multi storey building

A tested and researched underfloor heating solution keeps footsteps in control

Jyväskylän Holvi is a new apartment building with 43 apartments right in the heart of Jyväskylä. Uponor Tacker underfloor heating system and Uponor Smatrix Base room control system were installed in each apartment.

Industrial

A project of large numbers

the topping out for the largest investment of the Finnish forest industry, the new bioproduct plant under construction in Äänekoski in Central Finland, took place on the construction site mid-May 2016. Hectic installation work on the site will continue before the plant’s test runs begin next spring. Uponor Infra delivers municipal engineering to the site, such as water, sewer and stormwater pipes, and a massive Weholite cooling water discharge pipe that is over one kilometre in length.

Industrial

A new generation biotechnology factory

The object for the largest investment in the Finnish forest industry has been completed. Metsägroup's pulp mill in Äänekoski started operations in August 2017. Uponor Infra was involved in building a new generation bio mill.