Clean drinking water for 17,000 scouts,
Evo, Hämeenlinna,
Finland
Clean drinking water for 17,000 scouts
Uponor delivered 7,600 metres of pipes for the construction of the international scout camp. The pipes were used to supply clean water and to lead grey water away from the area in a controlled manner.
A town surrounded by forest
The Evo campsite in Hämeenlinna has been developed systematically to make it suitable for large events. The core network is built underground. In the area there are also two groundwater wells as well as buildings.The campsite extends over a very large area as it has to accommodate over 17,000 scouts. Therefore, water supply must be planned well. A total of 6 subcamps and a family camp for 3,000 people, which accommodated under-12-year-old scouts and their families, were built in the area.
Roihu2016 was built by volunteers
A surface network was built above ground for both clean and grey water. Uponor delivered to the area 32 and 40 mm PE pipes for the network. For clean drinking water, 15 and 18 mm PEX pipes were also used. The products to be used were required to be easy to install and resistant. Ease of installation and resistance ensure that the network will be built within schedule and that it will remain functional for the entire duration of the camp, respectively.”All installations are made above ground, with the exception of some pipelines that go under the road. The pipes must be of high quality in order to be able to withstand the stress that they may be subjected to. As installations are also carried out by non-professionals, the pipes must be easy to install,” emphasised Johanna Suomalainen, who served as acquisition manager for Roihu2016 during the acquisition phase.Roihu2016 was built in Evo by about 2,000 volunteers. The camp took over two years to plan. Four days before the construction of the actual camp, about one hundred people gathered in Evo to collect the goods delivered and to start building the necessary infrastructure, such as the water supply and sewer networks and the electrical grid. The construction of the actual camp took a total of nine days. The camp took about three days to dismantle. Therefore, the Evo campsite was back to its normal condition by the end of July.
Podobne projekty
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor Vortex stormwater solution
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
Rurociąg tymczasowy dla oczyszczalni Czajka
Szybka akcja była bardzo ważna, gdy poważnemu uszkodzeniu uległ kolektor ściekowy w Warszawie, powodując masowy wyciek nieczystości do Wisły. Załoga Uponor Infra pracowała 24 godziny na dobę, aby powstrzymać zanieczyszczenie rzeki. Tymczasowy rurociąg został wyprodukowany, dostarczony i połączony w ciągu zaledwie ośmiu dni.
Water supply in very demanding terrain in Norway
Inteligentny system retencyjny
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.