American School,
Nagykovácsi,
Hungary
American School
“Move!” We are convinced, that sports, primarily mass sports and leisure time sports, have an emphasised role in Hungary today – both from a pedagogical and a medical point of view.
contractor
Vegyépszer Zrt.
installer
Comfotherm Kft.
specifier
Kovács és Társa Kft.
Realization
The construction started in 2008, when the sports building of the school was built.Already during the design phase, a close cooperation started between the design company and Uponor Kft., thus Uponor sports floor underfloor heating was included with joint effort. Uponor Kft. supported the contractor with continuous on-site counselling.Uponor sports floor underfloor heating is a flexible solution for sports floors. These floors consist of an elastic PVC layer attached to a wooden layer. Heating tube registers are fixed in a patented Uponor rocking fixture directly under the flexible floor layer. The tubes are connected to a Tichelmann type manifold. Uponor sports floor underfloor heating can be installed quickly, mainly due to the rugged Pe-Xa tubes, but also due to the patented technology of the installation of sports floors. In the 700 m2 floor, nearly 5000 meters of 25x2,3 mm Uponor Pe-Xa tubes were installed. The sports floor underfloor heating provides excellent temperature comfort, and uniform temperature distribution without air movement. Due to the operation with low temperature heating medium, it is saving energy.
Podobne projekty
The power supply to the East Helsinki metro network will be protected with Uponor FastGuard
In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.
Uponor Flowise drinking water solution to Levi's tourism mecca
Uponor Flowise drinking water solution to Levi's tourism mecca
Tailored renovation solution
Old water intake plant upgraded to modern version
Brønderslev implements new treatment methods
Espoo's Itäranta is being renovated sustainably
Uponor-filterbrønde en del af regnvandsundersøgelsen
Weholite limits overflows and pollution in London
Uponor Vortex stormwater solution
Uponor filter chamber part of the stormwater study
Reservoir tank for unordinary village of Tuuri
Rurociąg tymczasowy dla oczyszczalni Czajka
Szybka akcja była bardzo ważna, gdy poważnemu uszkodzeniu uległ kolektor ściekowy w Warszawie, powodując masowy wyciek nieczystości do Wisły. Załoga Uponor Infra pracowała 24 godziny na dobę, aby powstrzymać zanieczyszczenie rzeki. Tymczasowy rurociąg został wyprodukowany, dostarczony i połączony w ciągu zaledwie ośmiu dni.
Water supply in very demanding terrain in Norway
Inteligentny system retencyjny
Unique design ensures controlled stormwater drainage
Sustainable sewer pipeline with Ultra Rib 2 Blue
An easy and reliable storm water solution
Life is grand for graylings in the pure waters of Ounasjoki River
Hybrid solutions for storm water management
City of Lahti is building new neighborhood called Ranta-Kartano. While they were constructing basic infrastucture the city saw the possibilty to reserve some ground space for storm water management. Now there is a test running for different kind of storm water management. Uponor is involved with new type of storm water filter.