Referanser
Sustainable solution for Denmark’s largest infrastructure project
Pump structure secures stormwater system’s long life
Pump structure secures stormwater system's long life in Jyllinge Nordmark
Faroe Island tunnel with Uponor pipe system
In December 2020, the Faroe Islands opened the country’s longest undersea tunnel, which considerably reduces travel time between the most populated islands. The 11.2-kilometre tunnel represents a significant infrastructure investment, which also boasts the world’s first undersea roundabout. Beneath the road, a sophisticated system of pumps and kilometres of plastic pipework ensure that the road is kept free of water and safe for motorists.
Ventilasjon i grunn (UVS) til Lilleborg skole
Vi leverte UVS til Lilleborg skole i Oslo. Med dette ventilasjonssystemet hentes luft fra et inntakstårn i skolegården, og ingen fasadeendring er nødvendig. Entreprenør på prosjektet er Energima.
Marine outfall pipeline for Stormwater in Lake Vättern
Obsolite and underdimensioned stormwater pipes were replaced by Weholite
Tailored renovation solution
The Vierimaantie road, located close to the town centre of Ylivieska, Finland has a concrete sewer line constructed in the 1960s and 1970s. A decision was taken to renovate this sewer using a tailored solution, and the product developed for this purpose is now also available to other customers.
Old water intake plant upgraded to modern version
The Hietasärkä water intake plant is part of the Suomussalmi water supply system, the task of which is to ensure the sufficiency of clean drinking water for the needs of municipal residents. Corrosion damage to the water supply network was previously prevented with lye, but due to safety risks, it was replaced by a chemical-free method. At the same time, an extensive overall renovation was carried out at the water intake plant.
Fordrøyningsmagasiner til nye sykehusparken, Rikshospitalet
Vi leverte to fordrøyningsmagasiner på 149 m3 og 236 m3 til den nye sykehusparken på Rikshospitalet. Med løsningen skal man få kontroll på overvannet i området. Entreprenør på prosjektet er Consto Anlegg AS.
Sjøkum for nedkjøling av industrimaskiner
Vi leverte en sjøkum til bruk ved Algea sin fabrikk i Kristiansund. Den 4250 mm høye kummen brukes til innpumping av sjøvann for nedkjøling av industrielle maskiner.
Brønderslev implements new treatment methods
3000 mm broerstatter
Vi leverte en broerstatter med rør og bekkeinntak til Haukåa bru i Prestfoss.