Nuorodos

,
Finland

Location
Finland
Komplektacija
2011
Pastato tipas
Visuomeniniai pastatai
Product systems
Modulinė sistema
Projekto tipas
Naujas pastatas

Lumijoen alkalointilaitos

Weholite-alkalointilaitos Lumijoen kunnassa
Panašūs projektai

Pump structure secures stormwater system’s long life

Pump structure secures stormwater system's long life in Jyllinge Nordmark

PE tanks reduce carbon footprint at new water plant

Novafos' new water plant in Ballerup, Lautrupvang Water Plant, is currently under construction. PE tanks from Uponor, part of the George Fischer Group, have been chosen for the project. The tanks solve economic and building aesthetic challenges, reduce CO2 emissions by up to 50 % compared to traditional tank solutions and increase security of supply.
 

The power supply to the East Helsinki metro network will be protected with Uponor FastGuard

In the fall of 2024, a groundbreaking electrical renovation was carried out on the metro line between Siilitie and Kulosaari in Helsinki. The aim was to improve the metro line's power supply and ensure its functionality during potential faults as part of a broader ring network solution. The project utilized FastGuard cable protection developed by Uponor, which is lightweight, durable, and quick to install.

Uponor Flowise drinking water solution to Levi's tourism mecca

The ski slopes of Levi attract thousands of tourists every year. Water consumption varies greatly, which is why the water intake plant in Kirakka in Levi was renovated to meet the consumption peaks during peak seasons. As part of the project, Uponor delivered two huge reservoir tanks to ensure sufficient supply of clean water in the area.