Promo Radiante Uponor: -50% di sconto sul tubo! Scopri di più
Contatti Uponor

Via Eugenio Villoresi 2-4
20864 Agrate Brianza – MB
Italia

529 Risultati trovati
City Hall
Ufficio

City Hall

The challenge began in 2021 when the building was completely redesigned to cut energy waste. Uponor Ecomate was installed to gain actionable insights into heating, cooling and power usage and improve the Town Hall's energy consumption and carbon footprint.

Uponor pressure pipe system Profuse in Borås town
Comune

Uponor pressure pipe system Profuse in Borås town

Better water flow in Frufällan

Thermal Šírava hotel
Hotel

Thermal Šírava hotel

Building a unique hotel with geothermal water.

Fish farming with the smallest possible footprint
Edificio industriale

Fish farming with the smallest possible footprint

Andfjord Salmon AS, a Norwegian fish farming company, has the ambition to create a sustainable, environmentally and fish-friendly onshore facility – with the smallest possible footprint. This patented facility combines the best from both traditional ocean net-pens and land-based salmon farming. The intake and outfall lines are built with highly durable Weholite PE pipes and panels with a 100-year life span.

Château Gbeľany
Hotel

Château Gbeľany

Internal distributions of health technology - footboards and horizontal distributions from dimension 20 to 90.

Construction of the N-S road in the area of mining damage
Trasporti

Construction of the N-S road in the area of mining damage

Problem-free operation in areas with mining damage in the Upper Silesia Industrial District thanks to the Uponor Infra pipe systems and retention tanks.
 
Renovation of the sewage collector
Comune

Renovation of the sewage collector

In 2021, a renovation of a corroded sewage collector was carried out in Swarzewo using a tight-fitting method.

Renovation of the railway culvert
Trasporti

Renovation of the railway culvert

Uponor Infra Sp. z o.o. supplied Weholite PEHD DN3000 SN8 with pipes for the renovation of a railway culvert.

Retention tanks for the railway station
Trasporti

Retention tanks for the railway station

The modernisation of the Warsaw West railway station is the largest construction project currently underway in the Polish capital.

Renovation of a water supply system in an area with mining damage
Comune

Renovation of a water supply system in an area with mining damage

In 2020, the water main between the reservoirs and the Paprocany pumping station in Tychy was upgraded with PE-HD pressure pipes by Uponor Infra.

Battery of retention tanks
Comune

Battery of retention tanks

In Mielec, modern storm water and snowmelt retention systems have been built, which will solve the problems with periodical flooding of streets and buildings in the city centre.

Emergency pipeline on a pontoon bridge
Comune

Emergency pipeline on a pontoon bridge

In 2020, Uponor did an outstanding job of installing an emergency pipeline on a pontoon bridge after an underground GRP sewage collector failed in Warsaw, the capital of Poland.