Kontakt
Uponor Hrvatska
Uponor d.o.o.
Dubravkin trg 2/1
10 000 Zagreb
Hrvatska
Reference

Production hall Eurom, Brno,
Brno,
Czech Republic

Production hall Eurom, Brno

Production hall Eurom, Brno

Uponor industrial underfloor heating.

Location
Brno, Czech Republic
Završetak
2010
Vrsta objekta
Industrijski objekti
Product systems
Površinsko grijanje i hlađenje
Adresa
Slatina
Vrsta projekta
Nova zgrada

An industrial underfloor heating system in fact

Headquarters of the company Eurom located in Brno Slatina includes administrative, storage and production facilities. It is a standalone building hall type, which is divided into two parts. The first part consists of administration and facilities. The second part consists of single-storey building with two-aisle production hall (the building footprint 78 x 36 m). Throw the center of each vessel leads communication area, around which individual manufacturing cells are concentrated. Both vessels are heated by an industrial underfloor heating system.
Underfloor heating: Uponor PE-Xa pipes 25 x 2.3 mm in clamp track
Floor Construction: Double Layer, steel fibre concrete.

Production hall Eurom, Brno

0002764
0002765
0002766
Slični projekti

Uponor Annex

The newest $18M manufacturing expansion for Uponor PEX pulls out all the stops with a highly efficient building incorporating the company’s plumbing, radiant, and snow melt systems. 

eMAG Warehouse

The largest online retailer in Romania has built two logistics warehouses totaling 250,000 m² in Joita commune, Giurgiu county. Each of them came with its own architecture, specific needs and constant activity in the interior space.

Würth Logistics Centre, Lithuania

Würth Logistics Centre is an exclusive build-to-suit project incorporating renewable energy sources.

Leica Camera AG Headquarters

The company headquarters of Leica Camera AG features a unique architectural design – controls temperatures with solutions from Uponor and Zent-Frenger.