Uponor UK
Head Office
Uponor UK
The Pavillion
Blackmoor Lane
Watford Hertfordshiree
WD18 8GA

References

525 Results found
Office

Rivergate

The RIVERGATE office building in Vienna, Austria, was certified as a Green Building by the EU andrelies on the efficient Contec ON concrete surface activation.

Hotel buildings

Bavaria Motel

High level of comfort meets low energy costs

Office

Villeroy & Boch

Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.

Multi storey building

Jinonický dvůr, 2nd stage

Reconstruction of the historic building into 46 apartments and 4 studios using Uponor products.

Multi storey building

Multi-family homes

Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.

Multi storey building

South Kilburn residential site

Connect the buildings to the district heating system that supplied the two site’s 300 apartments with hot water.

Office

New office in Västerås with a focus on modern and environmentally friendly solutions

The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.

Multi storey building

Infinity Forest Residence

Accessible and surrounded by nature, the site is surrounded by fresh mountain air, generous sun, surrounded by rich forest and park vegetation.
 The key words are the basis of the philosophy for the construction of Infinity Forest Residence: practicality, efficiency, spaciousness, freedom and healthy living.
 
 
Single homes

Underfloor heating and cooling for comfortable living in a summer cottage house

The new summer cottage house in Suolahti, Äänekoski, is using floor heating and cooling controlled by an Uponor Smatrix Pulse control system. The heat source will be a NIBE geothermal heat pump. Uponor and NIBE were responsible for the design and sizing of the heating and cooling system for the new house.

Cultural institutions

Cartuja Qanat

Disruptive urban transformation through water and Uponor's Thermatop M solution.