The plumbing in order in one go
Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.
Tage and Marjo Mattson decided to renovate their water and radiator plumbing in the fall of 2014. The house was 38 years old then, as were the pipes. In total, the renovation only took a couple of weeks.
Kiviniityn Auto- ja Maatalouskonehuolto Oy, based in Huittinen, initiated a construction project in 2012 to implement a modern building based around geothermal energy for use as commercial premises for a shop selling tools and spare parts.
The Kastelli community centre, which was completed in 2014, is the City of Oulu's educational, leisure and culture centre that serves the residents of the city in many different ways. Uponor's underfloor heating system has been installed in the building.
The heating system of a two-storey wooden one-family house built in 2004 was renovated in 2011 by upgrading Uponor's hydronic underfloor heating to an underfloor cooling system.
At the housing fairs of Kouvola, in summer 2019, was presented House Beauty which has the modern control system Uponor Smatrix Pulse for radiant underfloor heating and cooling system.
Construction of Finland's first virtually zero-energy hall was completed in May 2015. The hall was built for the Thin Sheet Centre research unit of the Häme University of Applied Sciences (HAMK) and it draws its energy primarily from energy piles and solar panels.
The old factory building gets a new life as loft apartment building. Skanska Oy renovated the building into 23 different size and type of apartments.
All solutions in the Puukuokka block, which was completed in Jyväskylä, have strived for sustainability, quality and coziness. Living comfort and energy efficiency are also ensured by radiant underfloor heating system installed in each of the block’s 186 homes.
As requested by the City of Vantaa, the Vaaralanpuisto day-care centre has been planned based on the "nearly 0 energy days" concept. Construction work for the day-care centre began in late summer 2016, and the project will be completed in July 2017. Project costs are estimated at EUR 5.4 million, and the day-care centre will accommodate about 130 children. Among the various energy production options available for the site, the City of Vantaa chose the energy pile and solar thermal collector system jointly developed by Uponor and Ruukki.
PowerPark's indoor karting hall became a functional and comfortable multipurpose hall when concrete replaced the asphalt floor and an energy-efficient and cost-effective Uponor Quattro floor heating system was installed underneath.
Jyväskylän Holvi is a new apartment building with 43 apartments right in the heart of Jyväskylä. Uponor Tacker underfloor heating system and Uponor Smatrix Base room control system were installed in each apartment.
Uponor products help ensure landmark district heating scheme cuts carbon emissions and reduces energy bills for residents.
European innovative references with built-in Uponor solutions