Zaurak Residencial by Grupo Ibosa, avant-garde and sustainability in the transformation of the banks of the Manzanares River
New Uponor collaboration with Grupo Ibosa and Morph Estudio
New Uponor collaboration with Grupo Ibosa and Morph Estudio
The Bävern block, located in the center of Karlstad, is a residential building that was completed in early 2023. Skanska, who built the homes, chose Uponor underfloor heating instead of radiators and also a variant that is completely new on the Swedish market and is adapted for multi-family buildings.
The new concert hall is an outstanding building and a new benchmark. Uponor has been involved for the underfloor heating and plumbing system as well as snow melting system for outdoor areas.
Part of the historic abbey complex on the premises of Villeroy & Boch's headquarters in Mettlach has been completely renovated.
Heat interface units provide a high level of warmth and comfort as well as optimum drinking water hygiene in three multi-family homes.
The plumbing company Mälardalens Rör in Västerås moved from their premises that they had been in since the end of the 80s. In November 2021, the first test trench was taken and at the turn of the year 2022/2023 they moved into the new office on a plot of land they have owned for a long time. We visited and spoke with the owners Robert Lind and Veronica Lange to hear more about the project.
The new summer cottage house in Suolahti, Äänekoski, is using floor heating and cooling controlled by an Uponor Smatrix Pulse control system. The heat source will be a NIBE geothermal heat pump. Uponor and NIBE were responsible for the design and sizing of the heating and cooling system for the new house.
Due to the interest rates of the floor structures, underfloor heating at Uponor's new head office required a solution that would raise the floor surface as little as possible. A functional result was achieved with an unusual implementation, low-structure underfloor heating plates, which are mainly used in renovations of detached houses, and which increase the floor height by only 15 millimetres.