A smart retention system for an anti-flooding solution
September 2018 saw the launch of the project for a stormwater drainage system in Rzeszów, almost 26 kilometres long, in the residential District of Budziwój, which partially coincides with the floodplain of the River Wisłok. One of the elements of this system is the retention canal. The project, scheduled for delivery by May 2020, will help to finally solve flooding problems which have been plaguing the residents of this region of Poland.
A raw water system for the new power unit
To ensure failure-free operation of a raw water system, a polyethylene-made pipeline (PEHD) with a length of approximately 9 km was installed (in mining damage conditions), of which 3 km uses the trenchless technique – relining.
An optimal solution for a Polish power plant
WehoSlurry polyethylene pipes with an additional, internal slurry layer, provided an optimum solution for hydrotransporting ash to the Bełchatów Power Plant’s disposal site.
Fighting against an ecological disaster in a world-record time
Rapid action was critical when a sewage collector broke in Warsaw, Poland, causing a massive waste spill into the Vistula River. Uponor Infra’s crew worked 24 hours a day in order to stop the pollution of the river. A temporary pipeline was produced, delivered and connected in just eight days.
Unique design ensures controlled stormwater drainage
In Slagelse Municipality, there are requirements for the drainage of rainwater and wastewater to be separated, and therefore it was important that the wastewater solution on the street, Nordre Ringgade, was also updated in accordance with current legislation. The client has received an approved solution where the wastewater from the commercial property in no. 59 has been separated from the rainwater. The rainwater is now diverted directly from the 2,500 m2 car park.
Johnson Residence
Justin Johnson and his wife, Jessica, had been planning their “forever home” for five years when they decided in late 2019 that they were finally ready to begin construction...
FishGLOBE revolutionises the future of plastic structures for marine conditions
As tall as an apartment building. A diameter of 22 metres. A volume of 3,500 cubic metres. FishGLOBE V5, a fish farming facility built and delivered to FishGLOBE AS in Stavanger in southwestern Norway, is the world’s largest PE plastic structure designed for marine conditions.
Sustainable sewer pipeline with Ultra Rib 2 Blue
The Ultra Rib 2 Blue pipes were first launched in Sweden – this year, the pipes have already been installed at several locations. In Finland, a pilot installation was carried out in early autumn in the Jalkaranta district of Lahti, a few kilometres from the city centre.
Weholite yields savings and smoother implementation
New dry land fish farm which will produce 3,200 tonnes of rainbow trout annually is being build in Eckerö in the Åland Islands. Uponor Infra has provided design assistance and delivers the pipes and is responsible for their installation and welding.