528 Resultater fundet
Ultra Rib 2 Blue first installation
Kommunalt byggeri

Ultra Rib 2 Blue first installation

In connection with a project in Sigtuna, the first pipes Ultra Rib 2 Blue are delivered. A new generation of pipes with 70% reduced carbon dioxide emissions. A significant part of the oil for the pipes comes from the waste industry and is vegetable.
 
WehoPuts 200pe installation
Enfamilieshus

WehoPuts 200pe installation

The family company Benders started in 1960 in Edsvära on the Varaslätten. Benders is today a market-leading manufacturer and supplier of products in concrete and natural stone.
 
ProFuse installed in Borås Stad
Kommunalt byggeri

ProFuse installed in Borås Stad

When the 250 millimeter pipes ProFuse replaces old 150 millimeter pipes in cast iron on a two-kilometer stretch in Frufällan, society will have a significant increase in capacity for the vital water supply. In addition, the new pipes provide fewer coatings and thus less service needs and better hygiene.
 
Extension of the district cooling station seawater intake in Helsingborg, Sweden
Industri

Extension of the district cooling station seawater intake in Helsingborg, Sweden

 The district cooling system in Helsingborg involves the streamlining of current production. By means of seawater and using heat from the district heating network to power an absorption cooling unit, district cooling provides much better environmental values than electric cooling units. The district cooling station is an efficient source of cooling for buildings, industrial facilities and shopping centres.

 

Uponor Vault cleans the storm water
Kommunalt byggeri

Uponor Vault cleans the storm water

As an industrial city and a port on an inlet of the Baltic Sea, Norrköping in southeastern Sweden strives to prevent pollutants from ending up in waterways. In an ongoing pilot project, pollutants carried by stormwater run-offs will be captured a massive, tailor-made Uponor Vault, a stormwater treatment chamber to ensure that the stormwater is purified before it reaches the Ljura Stream and finally the sea.
 
Weholite installed in Valdemarsvik Sweden
Kommunalt byggeri

Weholite installed in Valdemarsvik Sweden

In 1960, the Fifalla River, which flows through Valdemarsvik into the Valdemars Bay, was culverted. At the end of the 19th century, Lundbergs Läderfabrik was built over the last part of the river at the outlet, but in 1960 a culvert came into place, up to the factory under Storgatan for which the Swedish Transport Administration is responsible.
 
Stora Enso Nymölla mill biogas facility
Industri

Stora Enso Nymölla mill biogas facility

Stora Enso Nymölla Mill in southern Sweden produces pulp- and wood-free uncoated paper and is the second largest paper manufacturing company in Europe. Nymölla Mill belongs to the "Paper" division and has an annual capacity of 340,000 tonnes of pulp and 485,000 tonnes of paper. The mill started in 1962 and has 540 employees. The paper manufactured by Nymölla Mill is recyclable, renewable and biodegradable. Approximately 90% of Nymölla Bruk's paper brands have eco-label certification that certifies the products' reduced environmental impact during the product's life cycle. Paper products from Stora Enso are available all over the world.
 
Industribygning

Uponor soil drainage system big profile pipes in Skavsta Airport, Nyköping

When Stockholm Skavsta Airport grows out to a real international centre in Swedish civil aviation, Uponor is one the suppliers laying the ground.

Enfamiliehus

Uponor soil drainage system Ultra Rib 2 and surface water magazines in Borås Kärra

For those who will not leave the nearness to the town and will be closer to the nature, the future living is now built in Kärra, Borås.

Kommunalt byggeri

Safe and Sustainable

Weholite ensures safe and reliable transportation of stormwater and waste water - and safety is of utmost importance because the newly installed pipelines will run through a water protection area.

Kommunalt byggeri

Infratunnel protects pipes and cables in new residential area

The Weholite infratunnel in Linköping is almost 2 km in length and 2,200 mm in diameter. Water, sewage, district heating and cooling pipes as well as electricity and data cables are installed in the tunnel.

Focus on sustainability
Kommunalt byggeri

Focus on sustainability

Uponor Infra secure future sewer transport with Weholite. Uponor´s contribution to this complex and prestigious project is not just about supplying Weholite. It also includes project management and technical support such as design and calculations, customized products and field service with onsite installation - all coherently coordinated by Uponor Infra Project Services.