Distribution system for a reference building in the center of Bratislava,
Bratislava,
Slovakia
Distribution system for a reference building in the center of Bratislava
A unique multifunctional project in the centre of Bratislava
- Heracle s.r.o., Galvaniho 8, 821 04 Bratislava
A unique multifunctional project in the centre of Bratislava on the site of the former Stein Brewery, offering timeless housing.
The apartment section required a complete delivery of distribution pipelines and systems for mounting radiators using thermally insulated MLC piping ranging from 16 to 50 mm in diameter.
The plumbing in the TAP WATER section involved complete delivery of distribution pipelines and systems using thermally insulated MLC piping ranging from 16 to 50 mm in diameter.
A unique modular system using MLC Riser piping ranging from 63 up to 110mm in diameter was used in the Plumbing section for waste stack connections.
Подобни проекти
First high-rise residential building in Spain with Leed Gold certification
Greenwich Village on Coolhaven
Oval Village
Refurbishment of a prefabricated building
Decibel soil and waste system were installed in the new appartments in former prison Kakola.
Residential project with underfloor heating adapted for apartments
Infinity Forest Residence
В основата на философията за изграждането на Infinity Forest Residence стоят ключовите думи:
практичност, ефективност, простор, свобода и здравословен живот.
Apartment building Varsta Oy
A housing company Petreliuksenrinne
Stylish rock home was renovated with practical viewpoint
Small group home gets its own Clean II -wastewater treatment plant
Applewood Pointe
Underfloor cooling adds value to new construction
The joint renovation project in Maunula – cost savings through co-operation
Durability and quality are crucial in the award-winning wooden apartment block
Cost-effective and space-saving prefabricated module Reno Port ensures succesful renovation
Aleksanterinkatu 5 in Lahti will be completed with R2I blocks
Ewha Campus Complex
Ewha Womans University had planned the underground campus, which is a global trend for space creation, in order to solve the problem that the available space on the ground was insufficient despite the increase in the space demand in the campus, in accordance with the Ewha Womans University Development Plan in the 21st century.
Uponor participates in construction of Maarjamõisa Medical Campus
Sluseholmen
As a result, Uponor now offers a new, optimized and well structured, compact and easy to use prefab basic unit with flexible connectivity options for managing water and heating in varying types of housing.
From now on, Uponor provides the construction market with these prefab shaft units, primarily intended for modern floor building and terraced houses.
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area with a total area of 42000 square meters, 540 apartments.
Shanghai sheshan yard developed by Lujin company is a high-grade hardcover residential area, which is located in Shanghai,songjiang district, with a total area of 42000 square meters, 540 apartments.